Service project
Contact Us

Phone: 0573-5275789

Fax: 0573-5275789

Email: service@castlenannies.com

Web: castlenannies.com

sider
Service project

Air conditioning machine services

Air conditioning machine services

    air conditioning moves service process

    services: telephone quote → booking disassembly time, place home → services → → → air conditioning Assembly removal air conditioning costs;

    features: operating personnel with technical expertise, skilled and fast disassembly and Assembly;

    service: professional Assembly and disassembly.

    air conditioning move common sense:

    i. determine the installation location. must fully consider the layout easy to produce noise and vibration and convection to avoid installation in places.

    II. pipeline connections to be precise. pipelines open or not and the effects of air conditioning is essential.

    III. air conditioner mounting surface should be strong, have sufficient bearing capacity.

    v. air conditioner outdoor unit adjacent to the outside doors and Windows and green plants should be avoided.

    air conditioning move steps:

    i. preparation: staff the door disassemble and complete set of tools and safety equipment.

    II. recover refrigerant. first boot refrigeration. outdoor unit running take fluoride closed the valves, valve closed valve after the Frost melts, immediately shut down.

    pull off power, tighten insurance Cap. move the air conditioning refrigerants collected in the outdoor unit of the machine.

    III. split indoor units. when removing the indoor unit, should prevent the condensed water into the circuit board.

    v. split outdoor unit. Remove outdoor machines should be unloaded balance to avoid vibration shaking. Lastly with plastic wrap so that handling.

    v. installation. air conditioning installation should pay attention to the installation position and flow. Finally, detergent leak, observing each connector has no bubbles emerge, once after the system is leak-free, screw the valve protecting Cap.

    v. test. Finally ruled out of air in the pipe and power test-run installation is complete.

PREV: Residents moving services

NEXT: No informtation!

BACK